Skip to article frontmatterSkip to article content
Site not loading correctly?

This may be due to an incorrect BASE_URL configuration. See the MyST Documentation for reference.

Needs Assessment Guide

Steps 4–5 of the Hub Rollout Process

Your Role

You are the engineer assigned to this community. BD has closed the contract and you have context from the sales engineering call. Your job is to confirm what this community actually needs and turn that into an executable technical plan.

What You Need to Do

Confirm and validate requirements

Start from what the sales engineer learned, but verify it directly with the community. Things shift between “interested” and “signed contract.”

Pin down the technical specifics

Walk through each of these with the community. Don’t assume — ask.

Propose the technical plan

Translate the community’s needs into a concrete plan. This is where you apply 2i2c’s platform knowledge.

Write the GitHub issue

Create a New Hub Deployment issue (or equivalent) that captures the full plan. This is your handoff to execution — it should be self-contained.

The issue should include:

Each subtask should be something an engineer can pick up and complete independently.

What Success Looks Like

By the end of this step: